Location: Suining City, Sichuan Province, China

Overview:

  • 2 anaerobic digester (CSTR 1250m³ )
  • Wet gas holder: 800m³
  • Generator capacity: 500kW

Parameters:

  • Pig manure treatment
  • Feeding TS=8%
  • Gas yield = 2500 m³/day

Timeframe: 11/2009 – 04/2010